category
20018
Showing posts with label 20018. Show all posts
Showing posts with label 20018. Show all posts

. Saturday, July 28, 2018 .
We have been waiting to hear if Emmy got her Visa to travel to Brazil to see Andrea and her family.  Finally, she got a yes from the powers that be and I was off to the races.  Mark took me to JoAnn's and I was going to make a simple, soft, orange and black (AHS) fleece throw.  But then Emmy reminded me that they live on the equator.

So instead I picked up a jelly roll and a yard and a half of blue for the backing.  I am calling this the 6 Hour Quilt because it took me exactly 6 hours from start to finish.  I was totally amazed.  So it is packed in Emmy's luggage and making it's way to Davi as we speak.  I hope he likes it.

I'm Calling This The 6 Hour Quilt